Machine 1
Running
Machine 2
Running
Running Hours
Machine operation time analysis
Total Running
24H
18.5hrs
+12.3% vs yesterday
Avg Per Hour
RATE
0.77hrs
+5.2% efficiency
Uptime
STATUS
92.3%
Above target
Downtime
ALERT
1.85hrs
-8.1% vs avg
Running Hours Per Hour
Machine 1
Machine 2
Running Hours Per Shift
Historical Trend: Weekly & Monthly
Running Length (Meters)
Production output measurement
Total Length
24H
45,280m
+15.7% vs yesterday
Avg Per Hour
RATE
1,887m/h
+3.4% efficiency
Current Speed
LIVE
2,150m/h
Optimal range
Target Progress
GOAL
87.5%
On track
Running Length Per Hour
Machine 1
Machine 2
Running Length Per Shift
Historical Trend: Production Output
Electrical Parameters
Real-time power monitoring per machine
Machine 1 - Electrical Data
| Parameter | Current Value | Min (24h) | Max (24h) | Avg (24h) | Trend | Status |
|---|---|---|---|---|---|---|
| Active Energy | 842.5 kWh | 28.4 kWh | 45.2 kWh | 35.1 kWh | Normal | |
| Active Power | 38.7 kW | 32.1 kW | 48.5 kW | 38.2 kW | Normal | |
| Current | 58.2 A | 48.5 A | 72.3 A | 56.8 A | High | |
| Power Factor | 0.94 | 0.89 | 0.97 | 0.93 | Good |
Machine 2 - Electrical Data
| Parameter | Current Value | Min (24h) | Max (24h) | Avg (24h) | Trend | Status |
|---|---|---|---|---|---|---|
| Active Energy | 756.3 kWh | 25.8 kWh | 42.1 kWh | 31.5 kWh | Normal | |
| Active Power | 35.2 kW | 28.6 kW | 44.8 kW | 34.7 kW | Normal | |
| Current | 52.8 A | 44.2 A | 68.5 A | 51.2 A | Normal | |
| Power Factor | 0.92 | 0.87 | 0.95 | 0.91 | Good |
Energy + Production Analysis
Consumption efficiency & correlation insights
Energy / Running Hour
EFFICIENCY
86.3kWh/hr
-4.2% improved
Energy / Meter
COST
0.035kWh/m
-2.8% vs avg
Total Energy
24H
1,598kWh
+8.5% vs yesterday
Correlation
R²
0.94
Strong correlation
Energy vs Running Length (Efficiency)
Machine 1
Machine 2
Trend Line
Consumption vs Production (Shift-wise)
Hourly Energy & Production
Weekly & Monthly Overview
💡 Actionable Insights
✓ Efficiency Gain
Machine 1 shows 4.2% lower energy consumption per running hour compared to last week. Optimal operating conditions achieved during Shift B.
⚠ Attention Required
Machine 1 current draw is trending high (58.2A). Consider scheduling maintenance check to prevent potential issues.
📊 Production Insight
0.035 kWh/meter consumption rate. At current production speed, estimated daily energy cost is $127.84.